Critical Path Method (CPM)
(Redirected from critical path method)
A Critical Path Method (CPM) is an scheduling method that ...
References
2021
- (Wikipedia, 2021) ⇒ https://en.wikipedia.org/wiki/critical_path_method Retrieved:2021-12-4.
- The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.